First Layer of Main Street Paved in Pullman

(Pullman, WA) Last week, the first layer of asphalt paving was added to Main Street in Pullman. Also known as a “base layer,” the new roadway surface was added between Grand Avenue and Pine Street.

When an asphalt roadway is thick, it’s placed in layers to maximize compaction, strength and longevity. Work that occurs between the base and final layer of paving involves a careful process of adjusting all of the gas, water, sewer, and stormwater valve cans and lids.

Recommended Posts

Lewiston ID - 83501

45°
Rain
Saturday
Sat
48°
30°
Sunday
Sun
49°
40°
Monday
Mon
59°
45°
Tuesday
Tue
68°
49°
Wednesday
Wed
69°
51°
Thursday
Thu
72°
51°
Friday
Fri
75°
Loading...